Warehouse Flooring Solutions installs reinforced slab floors for utility depots, polished concrete storage areas and concrete refurbishment systems for power, water, gas and telecom storage sites across the UK. We design and install utility and infrastructure storage site flooring that supports fleet parking, materials handling and long-term equipment storage.

20 +

Years
Supporting Utility & Infrastructure Estates

Utility storage sites bring together cable drums, transformers, pipes, fittings, cabinets, plant and fleet vehicles on one estate. Floors and yards must provide consistent support for loaded vehicles, laydown areas and workshop bays while allowing clear separation between emergency stock, planned works materials and everyday consumables. We create floors that work with your existing civils, drainage and security arrangements.

Our Expertise

Right arrow Flooring Needs in Utility & Infrastructure Storage Sites

Utility and infrastructure storage sites often include covered stores, open compounds, cable yards, valve and pipe laydown zones, switchgear bays and small workshops. The same location may host response vehicles, mobile generators, spares for outages and long-term project stock. Floors and slabs must carry uneven loads from pallets, steel stillages and stacked components while remaining workable for forklifts, pickers and engineers on foot.

Many estates combine engineered slab construction in main depots with concrete resurfacing solutions used to recover older compounds and sheds. Within critical spares stores and enclosed logistics links, polished concrete flooring creates brighter, lower-dust environments similar to logistics hubs and transport maintenance depots.

  • Floors and slabs that support loaded utility vehicles, MEWPs and plant without progressive damage.
  • Surfaces suitable for cable drums, pipe skids, transformer plinths and racking legs.
  • Yards and internal floors that drain sensibly, avoiding standing water around key stock.
  • Defined routes for forklifts, fleet vehicles and pedestrian access to stores and workshops.
  • Compatibility with security fencing, bunds, drainage features and underground services.

Right arrow Flooring Problems in Utility & Infrastructure Storage Sites

Utility storage and operations sites often evolve over many years as networks change. Temporary yards become permanent, light store buildings end up carrying heavier stock, and older concrete or asphalt can begin to struggle with current demands.

Cracked or settled slabs beneath long-term stored transformers, cabinets or pipe stacks

Rutting and wear in forklift lanes and turning areas used by loaded vehicles

Damaged joints that jolt trolleys and sack trucks moving spares to workshops

Ponding around cable drums or pallet stacks, increasing corrosion and housekeeping issues

Patch repairs lifting in compounds and covered stores, leading to loose fragments and trip risks

Inconsistent levels between old and new slabs that complicate access for fleet and trailers

Right arrow Our Process

How We Upgrade Floors in Utility & Infrastructure Storage Sites

STEP 1

Estate Survey
and Asset Mapping

We walk the site with your operations or estates team, mapping where vehicles park, how stock is rotated and which compounds or stores are most critical for outages and emergency response. We note level changes, poor drainage, damaged slabs and any areas that already affect vehicle movements or access to infrastructure stock, drawing on experience from recycling centres and plant workshops with similar loading patterns.

Double arrowsSTEP 2

Floor Design,
Levels and Surface Systems

We prepare a practical scheme that may include new slab construction for depots where capacity needs to be increased, focused concrete resurfacing systems to recover worn internal floors and compounds, and polished concrete zones for enclosed stores or logistics links. We plan levels, falls, joints and interfaces so that vehicles, cable drums and racking all sit comfortably on the finished surface.

Double arrowsSTEP 3

Installation,
Phased Works and Handover

Works are sequenced around outage plans, seasonal programmes and standby arrangements. We take compounds, store aisles or building bays in turn so that key stock and response vehicles remain available. Damaged concrete is removed, the base is prepared and the new slab or resurfacing is installed. Each area is cleaned and returned ready for your own inspections, line marking and reoccupation.

BS 8204 Surface Regularity Standard

BS 8204

Floors are installed and checked to BS 8204, helping forklifts, vans and plant move predictably and supporting level storage for racks, drums and equipment stillages across the estate.

BS EN 206 Concrete Standard

BS EN 206

Concrete works follow BS EN 206 guidance for mix selection and curing, giving slabs the capacity to support utility vehicles, stacked materials and any resurfacing or polished finishes applied above the base.

CSCS Certification

CSCS Certified

Our teams hold CSCS cards and work confidently on live utility estates, respecting permit systems, exclusion zones and operational procedures while flooring works are underway.

SMAS Worksafe Contractor Accreditation

SMAS Worksafe

SMAS Worksafe accreditation demonstrates compliance with SSIP schemes, supporting structured safety management on flooring projects across utility storage sites, depots and compounds.

Get a Quote for Utility & Infrastructure Storage Site Flooring

We provide flooring solutions for utility depots, operations centres, compounds and storage buildings across the UK, helping you improve access, storage layouts and day-to-day reliability.

Contact us to discuss your project or request a quotation:

Or send your details using the form below and we will respond promptly.

Right arrow FAQ

Utility & Infrastructure Storage Site Flooring
Common Questions

How do you design floors for mixed fleet parking and materials storage on one site?
We start by mapping which areas need to host vehicles, which carry stacked materials and where foot access is most frequent. This allows us to combine slab construction for depots in high-load spots with suitable surface renewal in existing compounds and stores. The aim is to ensure that vehicles, racks, drums and pipe stacks all sit on floor zones planned for their particular loading and use.
Can flooring works be carried out while emergency response capability is maintained?
Yes. On utility and infrastructure sites we plan phasing around your standby and response arrangements. Compounds, aisles or parking rows are taken out of service in turn so core stock and key vehicles remain available. We agree access routes in advance to make sure that emergency response, fault repair and project teams can still reach the items they need during the programme.
Are your flooring systems suitable for cable drums, transformers and long pipe sections?
They can be. When we design slabs for utility yards we consider point loads from drum stands, transformer weight, pipe stacking and the equipment used to lift or move them. Where the base slab is sound but worn, we can install resurfacing systems that create a smoother, more consistent surface under these loads without rebuilding the entire structure.
How do you approach drainage and environmental controls on utility storage sites?
Drainage and surface falls are reviewed as part of the design, particularly where you have bunds, interceptors, oil storage or sensitive equipment. We can adjust levels and renew slabs so that water runs towards planned collection points rather than sitting around critical stock. This approach draws on methods used in processing centres and chemical storage warehouses, where environmental control is also a key factor.
Can external compounds and internal stores be improved as part of the same project?
Yes. Many programmes combine resurfacing of external compounds with new slab works and polished concrete finishes inside storage buildings. Treating external and internal areas together often provides better traffic routes, clearer access to stock and a consistent feel across the depot, while allowing procurement to handle the work under a single contract or framework call-off where appropriate.
What information do you need to price flooring works at a utility or infrastructure storage site?
Useful information includes any existing drawings, current and planned loading requirements, typical vehicle types, the nature of stored equipment and any known ground or drainage issues. From there we arrange a site visit to confirm slab condition, levels and access arrangements. This combination of data and on-site observation allows us to propose slab solutions, polished floors or resurfacing schemes that are proportionate to how the site really works.